Prerequisites
To start benefit from the Process Tracking Service you need to meet the following requirements.
Required upgrades
- Upgrade Studio to the latest version: https://download.uipath.com/UiPathStudioCloud.msi. Refer to the Studio user guide and Release Notes for more information.
- Make sure the Robot version is the same as the Studio version.
note
Process Tracking only works with the Studio Modern Design Experience.
Required activity packages
The following activity packages enable out-of-the-box process tracking.
For new automations, start with these versions from the beginning, for existing automations upgrade the packages to the specified versions.
- System Activities - use UiPath.System.Activities.25.2.1 or newer
- Integration Service Activities - use UiPath.IntegrationService.Activities.1.11.0 or newer
- Persistence Activities - use Persistence.Activities.1.5.16 or newer
- Document Understanding activities - use UiPath.IntelligentOCR.Activities.6.23.4 or newer
- Microsoft 365 activities - use UiPath.MicrosoftOffice365.Activities.2.9.11 or newer
- Google Workspace activities - UiPath.GSuite.Activities.2.8.25 or newer
For new automations using Long running workflows, leverage the Long running automation template that uses the Flowchart Builder activities package (version 1.0.0 or newer).
After the activity packages are upgraded, automations need to be republished to Orchestrator and the new versions need to be run several times before you can create a Process Optimization app based on the process.